Make us your home page
Instagram

Tampa airport's shuttle trams arrive from Japan at Port Tampa Bay (w/video)

TAMPA — The trains arrived by boat and are headed to the airport.

Twelve train cars, which cost $1.9 million each, make up the SkyConnect people-mover shuttle system currently being built as part of the $1 billion phase one renovation at Tampa International Airport. The tram cars arrived at Port Tampa Bay from Mitsubishi's plant in Japan Monday morning aboard an auto liner ship.

The cars were rolled off the ship and will be installed at the airport by its manufacturer, Mitsubishi, this week. The people-mover shuttle system will connect a new rental car facility and the economy parking garage to the main terminal and will be operational early next year, eliminating the need for passengers to catch a bus.

Previous Coverage: Here's an updated look inside the $1 billion construction project at Tampa International Airport

"These trains represent the future of the Tampa International Airport, and continues on our legacy of innovation," said Joe Lopano, CEO of the Tampa airport, at an unveiling ceremony Monday. Gov. Rick Scott was among the many local, regional and state officials who attended. "We're writing the next chapter of the airport. And we're still growing. We are on par to have the most passengers this year in our history," Lopano added.

The first phase one of the airport's master plan renovation, which has been three years in the making, is coming to a close with the arrival of the SkyConnect train cars this year. It was the first major renovation to the airport since the terminal was built in 1971. The improvements — which include adding a slew of new retailers and restaurants to the terminals, building a new rental car facility that's double in size and adding the new shuttle system — will help the airport accommodate 35 million passengers a year, or double the annual amount recorded in 2013. The project has been slightly delayed through the year, but remains under budget. TIA issued bonds, used passenger facility fee collections and $194 million from Florida Department of Transportation to finance the project.

Earlier this year the airport came under fire by state legislators for its spending on the renovation. The airport is currently undergoing an audit related to the project.

Airport officials asked the public to vote on a name for the new people-mover system, which is how the moniker "SkyConnect" was chosen. The trams feature images of native Florida birds.

Previous Coverage: Tampa International Airport morphing into a mini-city unto itself

The people-mover train will also be the connector from the main terminal to the Gateway development area, the centerpiece of the $543 million phase two of Tampa International Airport's master plan, a 17-acre commercial development which includes plans for up to two hotels, an eight-story, 240,000-square-foot office building, a 20,000-square-foot retail strip and a gas station with a convenience store.

Contact Justine Griffin at jgriffin@tampabay.com or (727) 893-8467. Follow @SunBizGriffin.

SkyConnect By The Numbers:

1.4-miles : length of people mover track

12 cars: Number of tram cars that will be used in two-car configurations

2.7 million: (estimated) number of car trips taken off airport roads due to shuttle service

$1.9 million: Cost per tram car

$417 million: Cost for entire people mover system, including stations.

6,900: Construction workers to build the people mover track and stations.

3.4 million: Hours worked during construction period

28 million: Pounds of steel poured to create the people-mover track and rental car facility

50 miles per hour: Maximum train speed

56 passengers: Capacity per car

2,500 passengers: Total number of people a car can move per hour per direction.

5 minutes: Trip length from rental car center to main terminal, including a stop at the economy parking garage.

Six birds: Featured birds on trams include a black skimmer, great egret, roseate spoonbill, white ibis, white pelican and a bald eagle.

13 months: Time to build and test the trams.

10,190 miles: Distance the cars traveled from Japan to Port Tampa Bay.

Tampa airport's shuttle trams arrive from Japan at Port Tampa Bay (w/video) 07/17/17 [Last modified: Tuesday, July 18, 2017 12:36am]
Photo reprints | Article reprints

© 2017 Tampa Bay Times

    

Join the discussion: Click to view comments, add yours

Loading...
  1. Irish 31 brings flair, flavor to Wiregrass

    Business

    WESLEY CHAPEL — Irish 31 Pub House & Eatery opened its fifth location at The Shops at Wiregrass earlier this month.

    hillsevbiz072117: Irish 31 has opened at the Shops at Wiregrass with a warm, wood decor. Photo courtesy of Irish 31.
  2. Family fun featured at Lutz-area ice cream shop

    Business

    LUTZ — For Joe Schembri, ice cream reminds him of fun times he spent with his family as a child.

    hillsevbiz072117: Joe Schembri has opened the Ice Dreamery in Lutz. Photo courtesy of Joe Schembri.
  3. Clean Eatz offers low-cal options in South Tampa

    Business

    Inside Clean Eatz, almost everything is under 500 calories.

    Clean Eatz will offer healthy dining options in South Tampa. Photo courtesy of Clean Eatz.
  4. Salon brings a Parisian experience to Tampa

    Business

    A new salon in International Plaza, opened by French women Geraldine Jousseau and Estelle Mattingly, takes clients on a trip to Paris.

    Le Studio Paris offers a variety of salon services in International Plaza. Photo courtesy of Le Studio Paris.
  5. Ratings service Nielsen begins tracking live TV consumption on Hulu, YouTube

    Retail

    TV ratings service Nielsen will begin tracking how many people watch network TV on YouTube and Hulu to gauge how many viewers broadcast networks have through streaming, the company announced Tuesday.

    Nielsen, a ratings company, is monitoring how many viewers watch live TV on Hulu and YouTube to get a better sense of overall viewership. | [AP]